Behind the 24 Hour Deck

How we build a deck in a single day.

A one-day build isn't rushed — it's planned to the hour. Most of the work happens before we even turn up. Here's exactly what goes on, and why it means a better result for you.

First: the pre-work you don't see

The reason we can build in a day is that the thinking, measuring and buying is all done first. By build morning, there are no decisions left to make — just building.

1 · Design locked in

We agree the size, layout, decking and finish with you up front — and you see it drawn to scale before anything is ordered.

2 · Materials sorted

Every board, pile, bearer and box of fixings is measured off a cut list and picked up in advance, so nothing holds the day up.

3 · Foundations planned

Pile positions and heights are worked out to NZS 3604 beforehand, so the frame goes down fast and dead level.

4 · Site & access checked

We confirm access, ground, services and the finished height with you, so there are no surprises on the morning.

5 · The details agreed

Fixings, edge style (like a picture-frame border), stain and finish are all decided with you before the day.

6 · Loaded the night before

Timber and gear are loaded and ready, so we're on the tools from the moment we arrive — not at the yard.

The build day — hour by hour

A time-blocked ~14-hour day. Every block has a job and a finish line, which is how a whole deck gets done start-to-finish without cutting corners.

6:00 am

Arrive & set out

Unload, protect the site and mark out the deck exactly. Get it dead accurate now — everything else follows these lines.

6:30 am

Foundations in

Piles set and levelled — Nurajack pedestals or timber piles in concrete, depending on the site. Planned and set out first, so the frame goes straight on top.

8:30 am

Bearers & joists

The structural frame goes down and gets squared and levelled. This is the bit that makes a deck last — we take the time here.

11:00 am

Frame checked

Every fixing, hanger and level double-checked before a single board goes on. Catch anything now, not after it's covered.

12:00 pm

Lunch & materials check

Quick break, and we lay out the decking run. A planned board layout means no ugly joins.

1:00 pm

Decking goes down

Boards fixed with consistent gaps and the right screws for the timber. The part you see every day — done neat and straight.

4:30 pm

Edges & fascia

Fascia and the picture-frame border if you've chosen one. The finishing touches that make it look built-in, not bolted on.

6:00 pm

Final fix & sand

Last fixings in, sharp edges eased, everything gone over. Safe underfoot and nice to the touch.

7:00 pm

Clean up & walkthrough

Offcuts and rubbish taken away, site left tidy, and we walk the finished deck with you. You start and end the day with a clean yard — and a deck you can use tonight.

Why one focused day beats a fortnight

Less disruption

One big day and we're gone — not two weeks of a half-built deck and a mess in your yard.

One fixed price

Because it's all planned first, the price is agreed up front. No day-rate creep, no surprises.

Momentum = quality

One crew, one flow, full focus — the deck is built as one continuous piece of work, the way it should be.